Orion-system PT-Link-LON Manual de usuario Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
PT-Link-LON
®
Technical Guide
PT-Link Interface
4
Connection and Wiring Information
Figure 2: PT-Link-LON
®
Interface Wiring
Modular Service Tool
Mode
Selection
ENTER
CLEAR
ESC
PREV
NEXT
DOWN
UP
6
5
4
DEC
7
0
8
13
2
9
MINUS
-
STATUS
SETPOINTS
SCHEDULES
CONFIGURATION
ALARMS
ON
OVERRIDES
BALANCE - TEST
Line Voltage
LON Connection
To LON Network
®
®
LON Connection
To LON Network
®
®
24 VAC
(10 VA)
Line Voltage
24 VAC
(8 VA)
Controller
SHLD
T
R
Typical Terminal Blocks. All
Wiring To Be T To T, SHLD
(G) To SHLD (G)&RToR
PT- Link-LON Interface
®
Note: All Programming Of
Controllers Must Be Done Using
The Modular Service Tool. The
Modular System Manager Should
Not Be Used On A System That
Has A PT-Link Installed.
Caution: The LON Network
Communication Terminal Block
Must Be Disconnected Before
Connecting The Modular Service
Tool. After Programming The
Controller, Disconnect
The Service Tool and Then
Reconnect The Communication
Terminal Block.
®
Wiring Notes:
1.) All wiring to be in accordance with local and national electrical codes
and specifications.
2.) All communication wiring to be 18 gauge minimum, 2 conductor twisted pair with
shield. Use Belden #82760 or equivalent.
Vista de pagina 3
1 2 3 4 5 6 7 8 9 ... 39 40

Comentarios a estos manuales

Sin comentarios